Skip to content
Telecom

NEC applies AI to subsea cable networks

By Maria Santos
1 min read
ASN Bell Labs set 65Tbps subsea cable speed record
ASN Bell Labs set 65Tbps subsea cable speed record
In this article (4)

NEC has announced it has applied AI to subsea cable networks to push the capacity limits of the transmission networks.

During joint research with Google, NEC applied AI and probabilistic shaping using 64 quadrature amplitude modulation (64QAM) to the FASTER subsea cable linking Taiwan, Japan and the US west coast.

The study demonstrated that the 11,000km FASTER cable can be upgraded to a spectral efficiency of 6 bits per second per hertz. This would represent a capacity of more than 26Tbps, over two and a half times the capacity originally planned for the cable.

According to NEC, the team used probabilistic shaping techniques that near the Shannon limit, the theoretical maximum transmission speed over a telecoms network before the signal is drowned out by noise, at a modulation of 64QAM.

For the first time on a live cable, AI was used to analyze data for the purposed of nonlinearity compensation (NLC). The trial used an NEC developed compensation algorithm based on deep neural networks to accurately estimate signal nonlinearity.

“Other approaches to NLC have attempted to solve the nonlinear Schrodinger equation, which requires the use of very complex algorithms,” NEC GM of submarine networks Toru Kawauchi said.

“This approach sets aside those deterministic models of nonlinear propagation, in favor of a low-complexity black-box model of the fiber, generated by machine learning algorithms. The results demonstrate both an improvement in transmission performance and a reduction in implementation complexity.”

Questions & Answers

Q.

Which specific subsea cable did NEC and Google use to apply AI and probabilistic shaping?

A.

They applied these techniques to the FASTER subsea cable. This cable links Taiwan, Japan, and the US west coast, and is 11,000km long. This was done during joint research to push capacity limits.

Q.

What capacity increase could the FASTER cable achieve after this upgrade, compared to its original plan?

A.

The study demonstrated it could achieve a capacity of more than 26Tbps. This represents over two and a half times the capacity originally planned for the FASTER cable, significantly boosting its performance.

Q.

What is the primary benefit of NEC's new approach to nonlinearity compensation compared to previous methods?

A.

NEC's approach, using deep neural networks, improves transmission performance and reduces implementation complexity. It avoids complex deterministic models, opting for a machine learning-generated black-box model of the fibre instead.

Reader pulse

NEC's AI cable upgrade:

24,545 votes so far

Weekly Briefing

Asia's retail intelligence, in your inbox

Monday, Wednesday and a Friday Weekly Wrap: the retail stories, numbers and moves that mattered across Asia. Nothing else, and you can unsubscribe in one click.

  • Top industry moves and market shifts
  • Weekly data-driven analysis from across Asia
  • Monday, Wednesday and the Friday Weekly Wrap

Read by retail operators, investors and brand teams across Asia.

Protected by a quick human check. No spam, ever. Unsubscribe in one click.

SecureGDPR ready